/ Leading Architectural Harmony

Project

Renovation of existing retail building complete with new portal frame facade and double height glazing.

440 Murray St, Perth

Froster Engineering empathised with the architect's desire to have exposed brick for the interior design for this retail upgrade proposed.

image

A JV3 alternate energy model was advised as the best path to take for compliance while maintaining the integrity of the interior design strategy. This list is not all inclusive so feel free to contact us regarding your project specific requirements. Our services offering will continue to develop to suit the bests interests of our society, clients and our team’s professional growth.

Note we performed a detailed Case Study on this project and have had alliance mechanical contractors treat as a “mock tender”.  We have accurate budget pricing and detailed design drawings on this ‘case study’ should you be interested to hear more.

For a detailed array of project types and value adding examples contact us direct to request a full capability statement.

  • JV3 Energy Efficiency Assessment
  • Specification of Glazing Performance
  • Case Study (Low Cost, High Performance) Mechanical Design

back to projects
 
Todd Doepel

Froster Engineering has successfully delivered the mechanical services for our recent 10,000m2 office building in Joondalup. Jeff worked enthusiastically and collaboratively with our design te... read more

Froster Engineering has successfully delivered the mechanical services for our recent 10,000m2 office building in Joondalup. Jeff worked enthusiastically and collaboratively with our design team to help deliver the first 5 Star Green Star office building in Joondalup. Jeff’s attention to detail, the client brief and onsite construction supervision has been appreciated and ensured we have been delivered a quality commercial development for the long term. I look forward to the ongoing relationship and future project opportunities.

Todd Doepel | Primewest