/ Leading Architectural Harmony

Project

4 Level multi-unit apartment development with ground level, naturally ventilated car park.

285 West Coast Hwy, Scarborough

Froster Engineering coordinated air conditioning, toilet exhaust and kitchen ventilation amenity within tight spatial constraints for this WA apartment development.

image

As is typical for most new apartment developments there is little room to navigate building services systems.  Panasonic high performance in ceiling fans were specified to allow for easy install, better performance and to suit the ceiling space available.  These fans have a suitable pressure to discharge appropriately via exhaust ductwork and weatherproof discharge louvre.  Any moisture left behind by steam from an occupant shower will be managed efficiently by this fan.

A typical simple element of any building can be treated as a “same as usual” specification.  Above example shows how at FE we look at ALL value adding elements to ensure the end user gets the best  performance outcome via implementation of the the most energy efficient system.

For a detailed array of project types and value adding examples contact us direct to request a full capability statement.

  • Mechanical (HVAC) Design
  • Construction Administration
  • Natural Ventilation Assessment (Carpark)

back to projects
 
Todd Doepel

Froster Engineering has successfully delivered the mechanical services for our recent 10,000m2 office building in Joondalup. Jeff worked enthusiastically and collaboratively with our design te... read more

Froster Engineering has successfully delivered the mechanical services for our recent 10,000m2 office building in Joondalup. Jeff worked enthusiastically and collaboratively with our design team to help deliver the first 5 Star Green Star office building in Joondalup. Jeff’s attention to detail, the client brief and onsite construction supervision has been appreciated and ensured we have been delivered a quality commercial development for the long term. I look forward to the ongoing relationship and future project opportunities.

Todd Doepel | Primewest